Note: The assignments is based on the same case, see attached. Write 9 pages Risk Workshop and Risk Register Component paper in which you: 1. Identify the required pre-workshop activities. 2. Prepare a risk workshop agenda based on Figure B-8, Sample Agenda for a First Risk Assessment / Two Day Risk Workshop (Appendix B, see attached). Include suggested time intervals for each activity and justify why each agenda item is relevant for this case. 3. Determine the top five (5) threats in a risk register following Figure B-11, Sample Simplified Risk Register Format (Appendix B, see attached). Include information from the case for each threat. 4. Justify the assignment of probability and impacts for each threat identified in criterion number 3. 5. Document the top three (3) opportunities in a risk register following Figure B-11, Sample Simplified Risk Register Format (Appendix B, see attached). Include information from the case for each opportunity. 6. Justify the assignment of probability and impacts for each opportunity identified. 7. Use at least 5 quality resources in this assignment. Note: Wikipedia and similar websites do not qualify as quality resources. Assignment must follow these formatting requirements: Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides. Include a cover page containing the title of the assignment, the students name, the professors name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.
