write a report for lessons learned , more details below

This is project management report For this order, pls. use previous order No. 82294520 as basis and a start point and pls. use same UK Writer 340501 as he is aware about his previous order 82294520 (refer feedback from tutor on submitted order 82294520 on page 5 of this document) End of Module Assignment Lets return to Woody case study (https://www.maxwideman.com/papers/woody2000/intro.htm) Woody has considered your report and has asked that you prepare another for him. Following on from your last report, he has been considering what lessons can be learned and has tasked you to prepare a report. The report is in two parts. Assignment This assignment has two parts, please make sure both parts are completed. The first part asks that with justification you: Advise how you would have planned the project given your choice of life cycle and methodology Evaluate and recommend tools that you would use to plan the project Advise what you would monitor including how frequently and what methods you would recommend to monitor and control progress of the project Evaluate methods and make recommendations regarding how you would have approached bringing the project back on schedule Advise how a project should be closed In the second part, he has asked you to summarise the role and the responsibilities of the project manager within such a project and to advise the key skills and knowledge required by a person to undertake this role so that he can minimise the risk of future project failure. Given the staff he currently has, would you recommend that he train internal personnel or contract out? If the latter, recommend what type of contract should be in place and why. It is important to Woody that you justify your choices and recommendations with reference to best practice, theory and research undertaken into effective project management.
Hide